INTERIOR SPACE ALTERATION AT THE U.S. ATTORNEY’S OFFICE
-U.S. General Services Administration
R.E.M. performed construction services for the renovation of the U.S. Attorney’s Office on the 11th floor of the Phillip Burton Federal Building in San Francisco, CA. This high profile project consisted of the tenant improvement of the entire main floor of the U.S. Attorney’s Office encompassing 50,000 s.f. The interior space alterations included constructing a new Media (News) Conference Center; renovation of two existing conference rooms; complete renovation of all offices, lunch rooms, libraries, mail room, supply room, and computer center; and construction of new offices and conference alcoves. This project involved all facets of construction as described below:

  • Flooring and Walls


  • T-Bar Ceiling Grids and Tiles


  • Office Systems Furniture


  • Break Room Sink and Cabinetry


  • Over 47 New Doors


  • Windows


  • Fire Protection System


  • HVAC and Miscellaneous Plumbing


  • Electrical


  • Security





U.S. CUSTOMS LAB SWING MOVE AT THE U.S. APPRAISER’S BUILDING
-U.S. General Services Administration
Design/Build services were provided for the U.S. Customs Lab Swing Move in the U.S. Appraiser's Building located in San Francisco, CA for offices and laboratories on the 11th floor. The project involved temporarily relocating the U.S. Customs laboratory while their current area was being renovated. Services included multi-discipline construction drawings, specifications, construction management and construction.

New STAIRCASE INSTALLATION AT THE U.S. BORDER STATION
-U.S. General Services Administration
The main purpose of the Design/Build project located in Calexico, CA was to remove the existing escalator and install a new staircase to provide better pedestrian access to the lobby from the second floor in the Main Building of the U.S. Border Station. In addition to the staircase installation, the canopy above the existing pedestrian booths was removed in order to provide a more spacious lobby. For the INS, electronic beam counters were installed and the existing pedestrian booths renovated. R.E.M. performed design and engineering, project management, construction, and construction management services.




  • Environmental Site Investigation


  • Abatement of Asbestos Containing Materials


  • Constructed temporary wall to isolate the construction area and pedestrian bridge under the existing canopy


  • Demolition and removal of the escalator, floor tile and slab


  • Excavation for installation of reinforced concrete foundation


  • Constructed foundation, staircase, and appurtenances


  • Installed new pedestrian booths, cabinets and electronic beam counters


  • Installed renovated and new lighting




 
 